I have decided to
change the way I work for this project in order to try help train myself
to work from initial idea, concept development and then to production a lot
faster. I consider myself quite methodical in the way I work in which I plan
and brainstorm for long periods of time before I begin to move on. Due
to the fact that the production for this brief is due on 27 March, I thought
it was apt that I attempt to quicken the process for this project in order to
help try and speed up my work in the future. I have designed all of the
following in sketch-up with site location - off location plan provided by
OISTAT (not accurate but helps to give sense of scale and location), before
rendering it with Indigo to begin to visualise how the design would work in the
space.
The idea behind
this design concept was to take elements from both an amphitheatre and a cinema
to design something that met the OISTAT brief. My idea was to create the stage
in the centre of a circular, tiered seating amphitheatre with the backstage being
underneath the audience’s tiered seats.
I wanted to relate
the idea that this float would be moored to the riverbed and the
particular performance itself. Therefore the nature of the performance
would be a dance emulating the fluidity of the river.
The choice for the
dome structure was to have l.e.d panels in a semi-spherical arrangement
displaying images of flowing water to help immerse the audience into the
performance. This would hopefully help allow them to make the connection
with their surroundings and the reasoning behind the particular choice
of performance.
On reflection, and
if I continue this idea forward, I will need to rethink the structure of
the float. I am trying to emulate the fluid forms of water through the
performance, thus this needs to be reflected in the structure also.







No comments:
Post a Comment